Alternative contracting methods (ACMs) have been increasingly used for airport capital construction projects to explore the opportunity for achieving better cost and time savings than traditional design-bid-build. Progressive design-build (PDB), an emerging variation of design-build, stands out as a promising delivery method that promotes collaboration between project stakeholders. Although PDB has been successfully used across building, water/wastewater, and transit construction sectors, its implementation in the aviation industry is still limited because of legislative considerations, regulatory policies, and funding constraints. A research gap exists in systematically investigating current practices in implementing PDB in airport projects. The main objective of this study is to explore the selection criteria, implementation strategies, success factors, and lessons learned from using PDB for airport capital construction projects. This study employed a triangulation research methodology, including a comprehensive review of PDB guidance and manuals, an industry survey of 39 airports across the U.S., and structured interviews with 12 airport representatives. This study found that the top four criteria for selecting PDB are: flexibility to handle complexity, reducing claims, industry input on constructability, and cost control. The main benefits of using PDB for airport construction projects include improving project schedules, enhancing design control levels, and better management of project complexity and risks. This study contributes to the body of knowledge by providing insights into the current PDB practices for airport capital projects. Lessons learned from implementing PDB can help airport authorities and owners better administer and manage their projects.


    Zugriff

    Download

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Implementation of Progressive Design-Build in Airport Capital Construction Projects


    Weitere Titelangaben:

    Transportation Research Record: Journal of the Transportation Research Board


    Beteiligte:
    Nguyen, Phuong H.D. (Autor:in) / Tran, Daniel (Autor:in) / Scott, Sid (Autor:in) / Konrath, Linda (Autor:in)


    Erscheinungsdatum :

    05.05.2024




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Last year's airport construction projects

    Gale, C.H. | Engineering Index Backfile | 1930


    Oakland Airport Connector: Pushing the Design-Build Envelope

    Dunscombe, Tom / Cartwright, Elaine | ASCE | 2005


    Oakland Airport Connector: Pushing the Design-Build Envelope

    Dunscombe, T. / Cartwright, E. / Transportation & Development Institute (American Society of Civil Engineers) | British Library Conference Proceedings | 2005


    Airport system capital requirements

    Workshop on Airport System Capital Requirements / USA, Federal Aviation Administration | TIBKAT | 1998


    Airport design and construction

    Davison, R.L. | Engineering Index Backfile | 1929