Fleet assignment and aircraft routing are two sequential steps in airline capacity planning. The fleet assignment model allots the scheduled flights covered by a type of aircraft on the basis of aircraft availability, and the aircraft routing model generates a route for each particular aircraft to ensure that the path-specific requirements for maintenance and connection times are satisfied. Although it is known that the sequential method is not able to minimize the overall cost, no results have been reported on the integration of the two steps. Here these two steps are completed simultaneously. A path-based integrated model is presented and tested on real data. A heuristic is proposed to solve the formulation. The numerical test indicates that a significant cost saving can be achieved and that the heuristic shows encouraging promise in solving large-scale real-world problems.


    Zugriff

    Download

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Integration of Fleet Assignment and Aircraft Routing


    Weitere Titelangaben:

    Transportation Research Record


    Beteiligte:
    Li, Yihua (Autor:in) / Wang, Xiubin (Autor:in)


    Erscheinungsdatum :

    2005-01-01




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Integration of Fleet Assignment and Aircraft Routing

    Li, Yihua / Wang, Xiubin | Transportation Research Record | 2005


    Integration of Fleet Assignment and Aircraft Routing

    Li, Y. / Wang, X. / National Research Council (U.S.) | British Library Conference Proceedings | 2005



    Integration of Fleet Assignment and Aircraft Routing

    National Research Council (U.S.) | British Library Conference Proceedings | 2005


    MANAGING UNCERTAINTY FOR RELIABLE FLEET ASSIGNMENT ACROSS AIRCRAFT FLEET OPERATORS

    NEAGU TCHAMKERTEN NICOLETA / WALDMAN GARY | Europäisches Patentamt | 2018

    Freier Zugriff