A practical problem in the operations of Line 2 of the Shanghai Metro in China—the severe congestion at the Guanglan Road station—led to the proposal of a total cost (including both operator’s and users’ costs) minimization model for redesigning short-turn operations. Existing studies were extended mainly by relaxing the assumption that the full-length route must be operated because this assumption was determined to be needlessly strict and could, therefore, lead to inferior solutions. Flexible models were designed to accommodate more complex combinations of train routes and to calculate potential waiting costs if no direct services were available for some origin–destination pairs. The method was tested through real-world case studies, and major findings were interpreted. Future research directions are also suggested.


    Zugriff

    Download

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Redesigning Rail Transit Short-Turn Operations: Case Study of Line 2 of the Shanghai Metro in China


    Weitere Titelangaben:

    Transportation Research Record


    Beteiligte:
    Sun, Yanshuo (Autor:in) / Schonfeld, Paul M. (Autor:in) / Lu, Yi (Autor:in) / Zhou, Ming (Autor:in)


    Erscheinungsdatum :

    2016-01-01




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Planning Urban Ring Rail Transit Lines: Case Study of Shanghai, China

    Saidi, Saeid / Ji, Yuxiong / Cheng, Cheng et al. | Transportation Research Record | 2016


    Shanghai Metro Line 1

    AEG Schienenfahrzeuge GmbH | IuD Bahn | 1995


    How does interchange affect passengers’ route choices in urban rail transit? – a case study of the Shanghai Metro

    Cheng, Yan / Ye, Xiafei / Fujiyama, Taku | Taylor & Francis Verlag | 2022

    Freier Zugriff

    Case 40: Shanghai Metro System

    Kumar, B Rajesh | Springer Verlag | 2022