The results from a research project that evaluated the long-term performance of bridges constructed with composite prestressed concrete panels are summarized. The particular construction system investigated used full-span prestressed concrete panels that would be typical for bridges with spans of 12 m (40 ft) or less. A full-scale bridge specimen was constructed and subjected to 5 million cycles of service loading and 48 weeks of durability exposure cycling. This was done to assess the potential for delamination as well as the resistance to chloride-induced reinforcement corrosion. The exposure cycling greatly accelerated the rate of penetration of chlorides, producing concentrations in the deck that exceeded those from bridges that had been in service for nearly 40 years. The results from this study showed that long-term composite behavior can be achieved in these structures by applying a raked finish to the top surface of the prestressed panels. Corrosion measurements revealed the need to modify the positive-moment connections at interior piers to provide a more durable structure.
Performance Evaluation of Composite Prestressed Concrete Slab Bridges
Transportation Research Record: Journal of the Transportation Research Board
Transportation Research Record: Journal of the Transportation Research Board ; 1740 , 1 ; 12-18
01.01.2000
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Performance Evaluation of Composite Prestressed Concrete Slab Bridges
Online Contents | 2000
|Load Testing of Prestressed Concrete Bridges
British Library Online Contents | 1998
|New Trends in Prestressed Concrete Bridges
Online Contents | 2000
|Structural Safety of Prestressed Concrete and Composite Steel Highway Bridges
British Library Conference Proceedings | 1995
|