The U.S. Army Corps of Engineers oversees dredging in hundreds of navigation projects annually, through its fleet of government equipment and through individual contracts with private industry. The research presented here sought to examine the decision to allocate dredge resources to projects systemwide under necessary constraints. These constraints included environmental restrictions on when dredging could take place in response to the migration patterns of turtles, birds, fish, and other wildlife; dredge equipment resource availability; and varying equipment productivity rates that affected project completion times. The paper discusses problem definition and model formulation of optimal dredge fleet scheduling within environmental work windows. In addition, a sensitivity analysis was conducted to provide decision makers with quantitative insights into dredging program efficiency gains that could be realized systemwide if environmental restrictions were relaxed. Opportunities exist to provide decision makers with quantitative insights into how efficiencies might be obtained if targeted research were to show that particular restricted periods could be relaxed without adverse consequences to sensitive and endangered species.


    Zugriff

    Download

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Optimal Dredge Fleet Scheduling within Environmental Work Windows


    Weitere Titelangaben:

    Transportation Research Record: Journal of the Transportation Research Board


    Beteiligte:


    Erscheinungsdatum :

    01.01.2014




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch





    Dredge Fleet Listings: Worldwide

    British Library Online Contents | 1998


    Boskalis' Dredge Fleet Stays Busy in Asia

    British Library Online Contents | 1996