State Transportation Agencies (STAs) recognized that to enhance the quality of construction documents, a review process must be incorporated into project planning, design, and procurement to evaluate projects for constructability. The benefits promised by constructability reviews (CRs) encouraged STAs to adopt it as part of their operations. This approach soon evolved into a structured process, recognized by researchers and practitioners as, the constructability review process (CRP). A significant component to the CRP success is to involve experienced construction personnel in CRs during the design phase; a major limitation of the traditional design-bid-build (DBB) delivery method. To overcome this limitation, more emphasis is being placed towards alternative project delivery methods (APDMs). As such, design–build (DB) and construction manager/general contractor (CM/GC) are among the APDMs most utilized by STAs to deliver transportation projects. Although extensive research has investigated CRs under DBB projects, research on CRs implementation under APDMs is remarkably absent. This study examines CRs utilization and staffing practices adopted by STAs across DBB, DB, and CM/GC projects. The results of this study were drawn utilizing data collected through a national survey questionnaire and interviews with selected STAs. The study found that CRs are initiated and implemented at proportionally similar phases across DBB, DB, and CM/GC projects. Investigation of staffing needs revealed that although the agency holds the executive role in implementation of CRs on DBB projects, their role shifts on DB projects to become more administrative. The agency continues to be involved in CRs under CM/GC projects, along with their allocated design consultant, in conjunction with the GC. The results of this study are anticipated to provide STAs with guidance for CRs utilization on DBB, DB and CM/GC projects.


    Zugriff

    Download

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Constructability Reviews Utilization Practices for Traditional and Alternative Project Delivery Methods Across State Transportation Agencies


    Weitere Titelangaben:

    Transportation Research Record


    Beteiligte:
    Smadi, Adi (Autor:in) / Tran, Dan (Autor:in) / Minchin, Edward (Autor:in)


    Erscheinungsdatum :

    2021-10-10




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Constructability Reviews Speed Bridge Project

    British Library Online Contents | 2003


    Analysis of Constructability Practices in State Departments of Transportation under Organizational Constraints

    Gad, Ghada Moustafa / Minchin, R. Edward | Transportation Research Record | 2022


    Mapping of State Transportation Agencies’ Practices and Perceptions in Project Bundling

    Shrestha, Saurav / Shan, Yongwei / Goodrum, Paul M. | Transportation Research Record | 2022



    Constructability: A Quality Improvement Approach to Transportation Projects

    Gambatese, John A. / McManus, James F. | Transportation Research Record | 1997