A model is developed for selecting and scheduling interrelated waterway projects. It considers multiple alternatives, which may be implemented at different times, for each lock site, subject to budget constraints. This large combinatorial problem is analyzed with a simulation-based optimization model, in which simulation is used to evaluate alternative project schedules. A genetic algorithm is developed to solve the problem efficiently, subject to constraints on project multiplicity and precedence.


    Zugriff

    Download

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Scheduling of Waterway Projects with Complex Interrelations


    Weitere Titelangaben:

    Transportation Research Record: Journal of the Transportation Research Board


    Beteiligte:


    Erscheinungsdatum :

    01.01.2008




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Scheduling of Waterway Projects with Complex Interrelations

    Wang, Shiaau-Lir | Online Contents | 2008


    The waterway ship scheduling problem

    Lalla-Ruiz, Eduardo | Online Contents | 2016




    Multicriteria analysis of inland waterway transport projects: the case of the Marajó Island waterway project in Brazil

    Pires, Floriano Carlos Martins / de Carvalho, Fabio Sciberras | Taylor & Francis Verlag | 2013