A blocked-out steel-backed timber guiderail and transition on steel posts were successfully developed and crash-tested in accordance with requirements set forth in NCHRP Report 350 for Test Level 3. The timber guiderail system was developed for placement along the scenic Merritt Parkway in Connecticut. The timber guiderail and transition were constructed from rough-sawn commercial Grade 1 southern pine backed with a 10- x 152-mm ASTM A588 Grade 50 structural steel plate. The guiderail was supported by W150 x 22.5 steel posts 2 m long, spaced 3.05 m through the length-of-need section. Reduced post spacings of 0.8 m and 1.5 m were used in the transition section.


    Zugriff

    Download

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Testing and Evaluation of Merritt Parkway Guiderail


    Weitere Titelangaben:

    Transportation Research Record


    Beteiligte:


    Erscheinungsdatum :

    1997-01-01




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Testing and Evaluation of Merritt Parkway Guiderail

    Lohrey, Eric C. | Online Contents | 1997


    Merritt parkway

    Nichols, C.G. | Engineering Index Backfile | 1940


    The Merritt Parkway

    Radde, Bruce | TIBKAT | 1993


    ELEVATOR GUIDERAIL SUPPORT DEVICE

    YAMANAKA KYOHEI / FUNAI NOBUHIRO | Europäisches Patentamt | 2016

    Freier Zugriff

    PennDot Improves Guiderail Maintenance

    British Library Online Contents | 1998