A double line of precast concrete, three-sided, arch culvert-bridge units that were used to enclose Brush Creek between two Kansas City, Missouri, suburbs is described. Two principal streets intersected on top of the structure. The contractor was allowed only 14 days to complete construction of the structure and reopen the intersection. The Brush Creek Improvements project in Prairie Village, Kansas, required 100 pieces of double-cell CON/SPAN precast culvert units with 6.10 m (20 ft) of span and 2.13 m (7 ft) of rise and 78 pieces of precast concrete footings. The design also featured an S-curve alignment.


    Zugriff

    Download

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Brush Creek Improvements: Double Cell Arch Culvert Installation in Prairie Village, Kansas


    Weitere Titelangaben:

    Transportation Research Record: Journal of the Transportation Research Board


    Beteiligte:


    Erscheinungsdatum :

    01.01.1997




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Brush Creek, Kansas City, Missouri: Hydraulic Model Investigation

    Linder, Walter Marcellus / Turner, Herman O. Jr. / United States. Army. Corps of Engineers. Kansas City District. | HENRY – Bundesanstalt für Wasserbau (BAW) | 1992

    Freier Zugriff

    Box culvert floating transportation installation method

    KUANG LEI / LIU DEJIN / XU WENJIE et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Columns - Russian Spacecraft Lands on Kansas Prairie

    Schroer, Ron | Online Contents | 2002


    Loading tests on an Armco pipe arch culvert

    Temporal, J. / Barratt, D. A. / Hunnibell, B. E. F. | TIBKAT | 1985