In 2012, KTMB launched a new fleet of China-made 6-car electric multiple units (EMUs) to augment their existing 3-car EMUs, the objective being to expand the capacity of its Klang Valley train commuter service from 33,000 to 95,000 passengers during the morning and afternoon peak hours. Due to significant expansion in train traffic density, it was essential to investigate whether the existing 25kV overhead centenary system (OCS) electrical network infrastructure could support the ensuing electrical power demands/loads due to the additional tractive effort of the 6-car trains and increased train traffic density. Traction power simulation study using MM-TRAIN software was conducted for this purpose. This paper illustrates the indispensable tool of traction power simulation software to access the performance of moving rail traction loads under normal (no outage) and under first emergency feeding conditions (n-1 outage contingency)
Simulation Assessment of the Existing KTMB Klang Valley 25kV Traction Power System Adequacy to Support the New 6-Car Train with Shorter Headway Commuter Service Operation
Applied Mechanics and Materials ; 793 ; 292-296
2015-09-21
5 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
AC 25kV traction power supply for Airport Rail Link Bangkok
Online Contents | 2011
|Bangkok Elevated Road and Train System. 25kV traction voltage for a mass transit railway
IET Digital Library Archive | 1998
|Stochastic Simulation of Traction Load for Urban Rail Transport Based on Dynamic Train Headway