In order to shorten the total time of the ships in port at a planning horizon, an integrated optimization method for berth schedule and quay crane allocation was developed. Interrelation between berth and quay crane allocation was analyzed, sharing quay cranes with the adjacent berths was put forward, dynamically allocating the limited quay cranes in the scheduling of handling tasks on each ship, an integer mathematical planning model was set up, and a corresponding genetic algorithm was designed to solve the problem. The result suggests that the method can improve container handling efficiency effectively compared with that of separate allocation.
Integrated of Berth Schedule and Quay Crane Allocation in Container Terminal
Applied Mechanics and Materials ; 513-517 ; 1437-1444
06.02.2014
8 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Integrating berth allocation and quay crane assignments
Online Contents | 2010
|Container Terminal Berth-Quay Crane Capacity Planning Based on Markov Chain
DOAJ | 2021
|The simultaneous berth and quay crane allocation problem
Online Contents | 2008
|The simultaneous berth and quay crane allocation problem
Online Contents | 2008
|The Integrated Berth and Quay Crane Scheduling Problem in Container Terminals
Trans Tech Publications | 2014
|