Pile-plank structure is a new foundation under rail. It has been applied in China, because of its advantages that it can control the foundation settlement effectively and speed up the progress of construction. Zhengzhou-Xi'an high-speed rail is designed to a 350km/h high speed rail. To control the post-construction settlement, speed up construction schedule, this measure is applied in the deep collapsible loess foundation, the first time in the world. To guide the engineering design and to form a theoretical system, field test researches were conducted in appropriate working points, mainly including stress-strain test of bearing sheet and contact stress test between bearing sheet and foundation.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Field Test Research of Pile-Plank Structure on Zhengzhou-Xi'an High-Speed Rail



    Erschienen in:

    Advanced Materials Research ; 354-355 ; 109-113


    Erscheinungsdatum :

    07.10.2011


    Format / Umfang :

    5 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Zhengzhou-Xi'an passenger-dedicated line

    Studiengesellschaft für den kombinierten Verkehr e.V. | IuD Bahn | 2006




    Elektrotechnische Ausrüstung der Strecke Zhengzhou - Xi'an in China

    Puschmann, Rainer / Li, Kai / Wang, Kiuzhong | Tema Archiv | 2014