This paper aims to using multistage inventory control theory to optimize traditional inventory control method, meanwhile, the spare parts supply of engineering ships are guaranteed and keep the cost in the lowest level. Moreover, in accordance with all kinds of construction task types to ensure the spare parts supply to satisfy engineering ships demand, and reduce the situation of shutdown unattended which is resulted by spare parts supply not in time.
Multistage Inventory Control Research of Engineering Ships' Spare Parts
Advanced Materials Research ; 909 ; 236-240
24.03.2014
5 pages