The analysis on the characteristics of each period in the starting process for common rail diesel engine was carried out. Rail pressure simulation model in the starting process was set by Matlab/Simulink. And rail pressure was tested in 4JB1 high pressure common rail diesel engine. The experimental results showed that idle rail pressure and engine speed fluctuated severely. Solution to correction of duty of metering unit(MeUn) at initial period was proposed, and effect of dragged laps on duty of MeUn was added in control strategy. The improved experimental results showed that amplitude of rail pressure fluctuation was very small and idle speed was no longer overshoot. The performance of diesel engine in the starting process has been greatly improved.
The Study on Control Strategy of Rail Pressure in the Starting Process for Common Rail Diesel Engine
Advanced Materials Research ; 588-589 ; 273-277
2012-11-12
5 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
The Research of Starting Control Strategies for Common Rail Diesel Engine
Tema Archiv | 2012
|The research of starting control strategies for common rail diesel engine
Kraftfahrwesen | 2012
|The Research of Starting Control Strategies for Common Rail Diesel Engine
Springer Verlag | 2012
|The Research of Starting Control Strategies for Common Rail Diesel Engine F2012-D01-011
British Library Conference Proceedings | 2013
|Diesel-engine management : [new: Common Rail]
SLUB | 1999
|