Detroit Edison's 5,100-ft steam line had to be replaced since it has already reached the end of its life-cycle. As a cost-savings measure, its was decided to leave the original lines untouched and buried in their existing trenches, and to dig a new trench to install a new, single 16-in cellular glass insulated steam line. The successful installation of this line is described.
Detroit Edison shares steam line replacement tips
1999
1 Seite
Aufsatz (Zeitschrift)
Englisch
Engineering Index Backfile | 1919
Engineering Index Backfile | 1897
Engineering Index Backfile | 1912
Features - Food Safety - Char Norton shares more HACCP start-up tips.
Online Contents | 2002
|Engineering Index Backfile | 1903
|