A seven-year program, designated 'Research & Development of Automotive Ceramic Gas Turbine Engine (CGT Program)', was started in June 1990 with the object of demonstrating the advantageous potentials of ceramic gas turbines for automotive use. This CGT-Program is conducted by PEC with the support of MITI. The basic engine is a 100-kW, single-shaft engine having a turbine inlet temperature of a 1350 Cel and a rotor speed of 110,000 rpm. During the second year of the program, experimental evaluation of the various components was started, including a centrifugal compressor, a radial turbine rotor, a high speed rotor system and initial ceramic hot parts. Cold and hot spin testing of ceramic rotors from three different ceramic suppliers was also initiated.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Status of the automotive ceramic gas turbine development program -year 2 progress -


    Weitere Titelangaben:

    Status des Entwicklungsprogramms der keramischen Gasturbine für Automobile - 2 Jahre-Fortschritt


    Beteiligte:
    Itoh, T. (Autor:in) / Kimura, H. (Autor:in)


    Erscheinungsdatum :

    1993


    Format / Umfang :

    8 Seiten, 15 Bilder, 3 Tabellen, 2 Quellen


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch






    Automotive Diesel Progress Status Report On DOEs Automotive Gas Turbine

    Wirgley,A. / Crysler,US / Williams Research,US et al. | Kraftfahrwesen | 1981


    Development Progress of Automotive Ceramic Gas Turbines

    Yoshida, Y. | British Library Online Contents | 1998


    Status of the Volkswagen Automotive Gas Turbine Program

    Walzer,P. / Volkswagenwerk | Kraftfahrwesen | 1980