New relationships are being developed between original equipment manufacturers and their suppliers. Early supplier involvement, long-term relationships and simultaneous engineering are commonplace in today's new vehicle development. Simultaneous engineering is the synthesis of the product design, analysis, development, test, process, reliability and manufacturing functions. It results in a synergy between the OEM and their first tier supply base and, in turn, second tier suppliers. The scope of this paper is the development and implementation of the new frame designs for the General Motors 1988 GMT 400 product line.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Light truck frame development through simultaneous engineering


    Weitere Titelangaben:

    Entwicklung der Rahmen leichter Lastkrafwagen durch simultanes Konstruieren


    Beteiligte:
    Kozerski, R.J. (Autor:in)

    Erschienen in:

    SAE-Papers ; Nov ; 1-7


    Erscheinungsdatum :

    1987


    Format / Umfang :

    7 Seiten, 13 Bilder


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Light truck frame development through simultaneous engineering

    Kozerski,R.J. / Dana,Parish Div.,US | Kraftfahrwesen | 1987


    Light Truck Frame Development through Simultaneous Engineering

    Kozerski, Richard J. | SAE Technical Papers | 1987


    Light Truck Aluminum Frame Development

    Boehm, B. Frank / Hatch, David E. | SAE Technical Papers | 1980


    Light Truck Aluminium Frame Development

    Boehm,B.F. / Hatch,D.E. / General Motors,Chevrolet,US et al. | Kraftfahrwesen | 1980