An upgrading exercise may take place under three circumstances. It may be a straightforward communications upgrade where there is already an existing 30 pair cable in situ. It may be carried out as part of a road widening contract when the communications are also re-equipped with a new cable infrastructure and new equipment. It may be an interim upgrade which takes place when an existing 20 pair installation is to be temporally used to operate a restricted NMCS2 service. These three possibilities are dealt with.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Upgrading from NMCS1 to NMCS2 (motorway control systems)


    Weitere Titelangaben:

    Die Fortentwicklung des Verkehrslenkungssystems NMCS1 zum System NMCS2


    Beteiligte:
    Hampshire, D.W.H. (Autor:in) / Cragg, P.R. (Autor:in)


    Erscheinungsdatum :

    1991


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    The A1 motorway upgrading in yorkshire, england

    Briggs, A. / Association for European Transport | British Library Conference Proceedings | 2003


    Motorway signal and control systems

    Hodgson, W.S. | Tema Archiv | 1993


    A Motorway-to-Motorway Control Results of a Simulation Study

    Elloumi, N. / Haj-Salem, H. / Papageorgiou, M. et al. | British Library Conference Proceedings | 1997


    Motorway traffic control system

    Brinkman, A. / Bloemendaal, A.L. | Tema Archiv | 1984


    Motorway networks, modelling and control

    Morin,J.M. / Gower,P. / Papageorgiou,M. et al. | Kraftfahrwesen | 1991