The East Coast Main Line is the most recent and significant addition to the British Rail electrified network and has interconnections into other electrified lines along its route between London King's Cross and Edinburgh. The line is in the process of being electrified, the completed part of the route being London to York and the Leeds branch. The electrification system is standard BR 25 kV single phase overhead. Incoming supplies are taken from the national grid network at 16 locations. The author looks at maintenance of the power supply, the overhead equipment, safety and performance management of the electrification equipment.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    East Coast Main Line: electrification fixed equipment maintenance


    Weitere Titelangaben:

    East Coast Main Line: Ausruestungen zur Wartung bei der Elektrifizierung


    Beteiligte:
    Dearman, P. (Autor:in)


    Erscheinungsdatum :

    1989


    Format / Umfang :

    5 Seiten


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch





    Mk IV passenger vehicles for East Coast Main Line electrification

    Watts, P.H. / Hawkridge, M.S. | Tema Archiv | 1989



    Main-line electrification

    Engineering Index Backfile | 1933


    Main line electrification

    Kennedy, J.M. | Engineering Index Backfile | 1932