The author discusses the functional problems characteristic of automated scheduling for the integrated training of military pilots, including the size of the search space (which is combinatorially explosive due to complexity and number of constraints), multiple competing goals, the time-based nature of the problem, and multiagent elements. She compares optimal linear programming approaches to the problem with artificial intelligence techniques. The solution techniques are explained, the advantages of an expert system approach are examined, and the approach, design, and performance of the system are discussed.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Automated constraint-based scheduling for pilot training


    Weitere Titelangaben:

    Automatisches, zwangbasiertes Scheduling fuer das Pilotentraining


    Beteiligte:
    Graham, J.M. (Autor:in)


    Erscheinungsdatum :

    1989


    Format / Umfang :

    3 Seiten


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Constraint-Based Scheduling System

    Zweben, Monte / Eskey, Megan / Stock, Todd et al. | NTRS | 1995



    AUSBAT - Automated Testing for Pilot Training Applicants

    Beckett, P. / Bongers, S. / Institution of Engineers, Australia et al. | British Library Conference Proceedings | 1995



    Vehicle Scheduling with Time Constraint

    Freling, R. / Paixao, J. M. P. / University of Lisbon et al. | British Library Conference Proceedings | 1995