The problem with software is people: people who manage the process, people who do the systems engineering, people who do the programming, people who do the validation and verification, people who maintain configuration management and, perhaps most important of all, people whose requirements statement initiates the entire process. The difficulty, or even impossibility, of writing definitive requirements for software intensive systems, such as C4I, at the beginning is a fact the industry must recognize.
Danger: software ahead
Gefahr:Software voraus
Signal ; 43 , 9 ; 27-29
1989
3 Seiten, 9 Quellen
Aufsatz (Zeitschrift)
Englisch
Danger Ahead - Electronic technology gives drivers the margin of safety they need to avoid accidents
Online Contents | 2002
|DANGER NOTIFICATION DEVICE, DANGER NOTIFICATION METHOD, AND DANGER NOTIFICATION PROGRAM
Europäisches Patentamt | 2018
|DANGER NOTIFICATION DEVICE, DANGER NOTIFICATION SYSTEM, DANGER NOTIFICATION METHOD, AND PROGRAM
Europäisches Patentamt | 2018
|DANGER DETECTING DEVICE, DANGER DETECTING METHOD, AND DANGER DETECTING PROGRAM
Europäisches Patentamt | 2021
|Danger identification method, danger identification system, and danger notification method
Europäisches Patentamt | 2023
|