The measurement and improvement of track quality are key issues in determining the time at which railway maintenance must be performed and its cost. Efficient track maintenance ensures optimum allocation of limited maintenance resources which has an enormous effect on maintenance efficiency. Applying an appropriate tamping strategy helps reduce maintenance costs, making operations more cost-effective and leading to increased safety and passenger comfort levels. This paper discusses optimisation of the track geometry inspection interval with a view to minimising the total ballast maintenance costs per unit traffic load. The proposed model considers inspection time, the maintenance-planning horizon time after inspection and takes into account the costs associated with inspection, tamping and risk of accidents due to poor track quality. It draws on track geometry data from the iron ore line (Malmbanan) in northern Sweden, used by both passenger and freight trains, to find the probability distribution of geometry faults.
Optimisation of track geometry inspection interval
2014
11 Seiten, 20 Quellen
Aufsatz (Zeitschrift)
Englisch
Optimisation of track geometry inspection interval
SAGE Publications | 2014
|Optimisation of track geometry inspection interval
Online Contents | 2014
|Development of Performance-based Track Geometry Inspection
British Library Conference Proceedings | 2001
|Track geometry inspection using an unattended instrumented freight car
IuD Bahn | 2009
|