In order to improve the quality of integrated pipe network design, reduced the illogical arrange and conflict in the blueprint of the integrated pipe network, and provided a zero conflict blueprint for pipe network construction. Based on the 3D information technologies, building aided design module of the metro station integrated pipe network aided construction and management system. Through the parameterized modeling technology, 2D information of the metro station transformed to 3D information model, realized the functions of property management, finding and modify conflict for 3D information modeling. Finally, the system was applied in Ningbo Metro Line 2, solved the problem of conflict in design, provided a collaborative design system for Design Institute.
Design & Realization of Aided Design Function of Aided Construction and Management System for Integrated Pipe Network of Metro Station
2013
5 Seiten
Aufsatz (Konferenz)
Englisch
AIAA | 1991
|IPC2001D095 The Design and Realization of The Computer Aided Engine Overall Conceptual Design System
British Library Conference Proceedings | 2001
|Tema Archiv | 1978
|British Library Conference Proceedings | 1994
|