Chongqing Chaotianmen Bridge is by far the world's largest three-span continuous half-through double-layer steel truss tied arch bridge. Risk evaluation and risk analysis are made to the bridge during construction period. At the same time, various measures are taken to avoid construction risks and accidents. The principal line of risk controls is clear with reasonable control measures. Chongqing Chaotianmen Bridge was completed and available for traffic on April 29, 2009, its various technical and quality indicators are in accordance with design and specifications.
Assessment of Risks during Large-Span Steel Truss Arch Bridge Construction
CEABM, International Conference on Civil Engineering, Architecture and Building Materials, 3 ; 1353-1357
Applied Mechanics and Materials ; 361-363
2013
5 Seiten
Aufsatz (Konferenz)
Englisch
Large-span roof steel truss hoisting construction method
Europäisches Patentamt | 2025
|Truss type wheel-rail bridge deck crane and large-span steel box bridge construction method
Europäisches Patentamt | 2021
|Dynamic Analysis of Long Span Continuous Steel Truss Arch Bridge under High-Speed Train
British Library Conference Proceedings | 2009
|