The research objective is to support the maintenance unit with route planning prior to performing road inspection, the model is based on VRP problem settings, and with the addition of compulsory road sections and allowing shortcuts through small pathways during the inspection to reduce time consumption. By employing Constraint Programming (CP) technology and optimization solution mechanism to construct inspection scheduling model, and the objective is to minimize time consumption of the road inspection. The province and county roads in Douliou city are chosen as examples for analysis, plans out best routes for inspection process, and also displays all the road sections passed by inspection vehicle. Thus this model can be used as reference to support the authorities to efficiently allocate resources for the inspection process, and achieve the objective as shorten the inspection time consumption.
Road Inspection Scheduling Model Using Constraint Programming
CEABM, International Conference on Civil Engineering, Architecture and Building Materials, 3 ; 2720-2725
Applied Mechanics and Materials ; 357-360
2013
6 Seiten
Aufsatz (Konferenz)
Englisch
Train scheduling using constraint programming techniques
Tema Archiv | 1993
|Constraint logic programming and scheduling
British Library Online Contents | 1995
|A constraint programming model for real-time train scheduling at junctions
Online Contents | 2007
|Constraint programming approach to quay crane scheduling problem
Elsevier | 2013
|