The present paper focuses on parts presentation in manual assembly. Its aim is to determine how kitting affects the time spent by the assembler fetching parts and, more specifically, what is the impact of the proportion of parts included in the kit. The present paper is based on four case studies of automobile assembly, in which parts presentation by kitting is compared with parts presentation in component racks. In the case studies, kitting enabled shorter distances between parts presentation and assembly object and thereby a potential reduction in the time spent fetching parts. However, when only a proportion of parts were kitted, the time spent fetching parts was not always reduced, in spite of this potential. The present paper finds that when deciding which parts should be kitted, attention should be paid to how and in what order assembly operations are performed.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Kitting and time efficiency in manual assembly


    Beteiligte:
    Hanson, Robin (Autor:in) / Medbo, Lars (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    2012


    Format / Umfang :

    11 Seiten




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Automation of Sorting and Kitting from Cutting Tables

    Berg, Erik | SAE Technical Papers | 2019


    Kitting in the Wild through Online Domain Adaptation

    Massimiliano Mancini / Hakan Karaoguz / Elisa Ricci et al. | BASE | 2018

    Freier Zugriff

    Kitting performed by a collaborative robot with an anthropomorphic tool

    Gottschlich, Marcus | BASE | 2020

    Freier Zugriff


    Modeling of Fastener Kitting Logistics for Boeing Wide Body Airplanes

    Kirkham, Cliff J. / Osa, Hansen N. / Storch, Richard L. et al. | SAE Technical Papers | 2009