The conventional mucking system of tunnel construction in China has a series of deficiencies and stubborn problems. Tunnel mucking technologies matched with different tunnel construction methods have been analyzed systematically and the continuous belt mucking methodology which is appropriated with drilling-blasting method was presented. The continuous belt mucking technology includes mucking scheme design and mucking equipment configuration. Compared with the conventional mucking methods, the comprehensive benefit can be fully demonstrated by the new continuous belt mucking system. On the other hand, the predominance on environmental protection of the continuous belt mucking technoloty matches up with the conservation policy. The technology would be widely applied in long tunnels and tunnels embedded in frozen ground and located in bitter cold plateau. The economic benifis and contribution to society of continuous belt mucking technology would be remarkable.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Continuous Belt Mucking Technology of China Railway Tunnel Construction


    Beteiligte:
    Sun, Ya-Ting (Autor:in) / Mei, Zhi-Rong (Autor:in) / Zhang, Jun-wei (Autor:in)


    Erscheinungsdatum :

    2012


    Format / Umfang :

    9 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Wheeled mucking systems

    Jones, M.B. | Tema Archiv | 1985


    Air conditioning system for cab of mucking loader

    LI HU / ZHAO JUN | Europäisches Patentamt | 2021

    Freier Zugriff


    Railway tunnel construction protection system

    JIANG QINGSHAN / SHI XUNING / ZHANG JIAN et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Modern methods in railway tunnel construction

    Churchill, Charles S. | Engineering Index Backfile | 1915