Due to over length and weight of the girder segment, the main bridge steel box girder of Chongqi Bridge adopts large segment integral lifting erection method; two sets of large floating cranes are needed for hoisting. According to the water environment condition at site, select the lifting equipments to research on; conduct restrict checking on the lifting weight, height and amplitude; new automatic balance type lifting sling structure form is adopted during lifting erection to make sure the stress on each lifting point is balanced; conduct optimization design onto the lifting points; aimed at lifting erection of large segments, use ansys to establish large solid simulation model for finite element analysis so as to guarantee safety of steel box girder structure during lifting erection of large segment.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Research on Integral Lifting Continuous Steel Box Girder Bridge Construction Technology


    Beteiligte:
    Zhang, Hong (Autor:in) / Zhang, Yong-Tao (Autor:in) / Zhu, Hao (Autor:in) / Gao, Ji-Bin (Autor:in)


    Erscheinungsdatum :

    2012


    Format / Umfang :

    8 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Steel box girder bridge deck integral lifting structure and mounting method

    ZHANG QIDONG / WANG XIAOLIANG / ZHU XIAOJIN et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Steel box girder mid-span continuous section ultra-long span integral lifting construction method

    ZHANG KUNQIU / HUANG YUN / ZHANG JIANLING et al. | Europäisches Patentamt | 2024

    Freier Zugriff


    Steel truss girder bridge girder transporting flatcar

    ZHENG LIANGFEI / LIU LAN | Europäisches Patentamt | 2020

    Freier Zugriff

    Steel truss girder bridge girder transporting flatcar

    ZHANG LIYUN | Europäisches Patentamt | 2021

    Freier Zugriff