In oil production engineering, layered gas production is an important mining technology. While the interlayer pressure of natural gas well differs big, the interlayer interference forms. It is difficult to exploit the low pressure layer and control the high pressure layer. Developing a technical pipe string with integrating layered gas production can solve the above problems. This technical pipe string changes throttling area by striking, solves the conflicts between each layer, mines each layer uniformly and enhances recovery. It applied to Tai 4-28 gas well in Sebei-gas-field which is located in east of Qaidam basin perfects the 4th department of shallow layer well pattern, forms new capacity, controls each layer pressure and capacity smoothly, protects the reservoirs effectively, achieves good effect in practice.
Research and Application of Technical Pipe String with Integrating Layered Gas Production in Oil Production Engineering of Mining Engineering
2012
5 Seiten
Aufsatz (Konferenz)
Englisch
Production Engineering Research Association
Emerald Group Publishing | 1979
Integrating ergonomics and engineering in the technical design process
Tema Archiv | 1994
|Integrating engineering with training simulation
Tema Archiv | 1989
|Integrating Ergonomics into Engineering and Engineering into Ergonomics
British Library Conference Proceedings | 2007
|