In oil production engineering, layered gas production is an important mining technology. While the interlayer pressure of natural gas well differs big, the interlayer interference forms. It is difficult to exploit the low pressure layer and control the high pressure layer. Developing a technical pipe string with integrating layered gas production can solve the above problems. This technical pipe string changes throttling area by striking, solves the conflicts between each layer, mines each layer uniformly and enhances recovery. It applied to Tai 4-28 gas well in Sebei-gas-field which is located in east of Qaidam basin perfects the 4th department of shallow layer well pattern, forms new capacity, controls each layer pressure and capacity smoothly, protects the reservoirs effectively, achieves good effect in practice.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Research and Application of Technical Pipe String with Integrating Layered Gas Production in Oil Production Engineering of Mining Engineering


    Beteiligte:


    Erscheinungsdatum :

    2012


    Format / Umfang :

    5 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Production Engineering Research Association

    Emerald Group Publishing | 1979


    Integrating ergonomics and engineering in the technical design process

    Haslegrave, C.M. / Holmes, K. | Tema Archiv | 1994


    Integrating engineering with training simulation

    Marshak, W.P. / Purvis, B.D. / Green, T.B. | Tema Archiv | 1989


    Fatigue Life Prediction of Buckling String with Cracks in Horizontal Wells of Mining Engineering

    Wang, Peng / Yan, Tie / Bi, Xue-Liang et al. | Tema Archiv | 2012


    Integrating Ergonomics into Engineering and Engineering into Ergonomics

    Carey, M. | British Library Conference Proceedings | 2007