The amount of water and sediment reduce obviously in Ning Meng reach because of the influence of the regulation of Long-Liu reservoir in upper of Yellow River, rainfall and production and living use water, especially the time reduce of large flows and the growth of small flow duration time, resulting main channel siltation and atrophy severe in the Inner Mongolia Reach, lower bankfull discharge, the main channel flooding capacity decreased when the great flood of water level rise, resulting in the increase of the river's ice flood control pressure. The study will provide technical support for flood control decision-making.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    The Capability Analysis of Flood Discharge in Ningmeng of Yellow River


    Beteiligte:
    Jing, Xin-Ai (Autor:in) / Lin, Xiu-Zhi (Autor:in) / Hou, Su-Zhen (Autor:in) / Liu, Gen-Li (Autor:in)


    Erscheinungsdatum :

    2012


    Format / Umfang :

    5 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch





    Brief Analysis of Environmental Supervision Regarding Flood Control Projects in the Lower Yellow River

    Yuan, D. / Jun, Y. / Xiaoling, L. | British Library Conference Proceedings | 2010


    Analysis of Discharge Capacity and Flood Storage Rate during 2015 Large Flood in the Kinu River

    Tabata, Kosuke / Fukuoka, Shoji / Deguchi, Keisuke | HENRY – Bundesanstalt für Wasserbau (BAW) | 2016

    Freier Zugriff


    Flood discharge formulae

    Walker, Thomas. | Engineering Index Backfile | 1922