Zhenshui is the biggest tributary of Xiaolangdi Reservoir and its original storage capacity is 1.767 billion m3. By October 2010, the amount of sediment in Zhenshui reached 0.1691 billion m3, and the sand bar at Zhenshui estuary was 7 m in height. Influenced by operational mode of reservoir and terrain, the formation of sand bar has certain inevitabilities. The sand bar can prevent water and sediment exchange between mainstream and tributary, and the internal storage capacity of tributary is not effectively used. The experimental result shows that during the later sediment retaining period, some small reservoirs can be built at the end of Zhenshui. By restoring water during the high water level in non-flood season in these small reservoirs and discharging flow during the low water level in flood season to scour sand bar, the tributary and main channel in Xiaolangdi Reservoir can be linked up in long term, service efficiency and life of tributary storage can be increased.
Experimental Study on Zhenshui Sand Bar and its Treatment in Xiaolangdi Reservoir
ICCAHE, International Conference on Civil, Architectural and Hydraulic Engineering, 2012 ; 2318-2323
Applied Mechanics and Materials ; 204-208
2012
6 Seiten
Aufsatz (Konferenz)
Englisch
Unusual solution for the slurry trench cutoff wail at Xiaolangdi
Online Contents | 1998
|Progress at Xiaolangdi: China's key project on the Yellow river
Online Contents | 1998
An assessment of sluicing rockfill material at the main dam of the Xiaolangdi project in China
British Library Online Contents | 1998
|Experimental Study on an Ideal Compaction Grouting into Sand
TIBKAT | 2016
|