The ground settlement caused by high-rise buildings is prominent increasingly with the rapid development of city construction, and will have negative influence on the surrounding gas pipelines. In this paper, an on-site monitoring system for settlement and stress-strain of buried gas pipeline is established, located in the neighboring area of Shanghai Center Tower, which is being built and will be the tallest building in china. The continuous online, real-time monitoring of stress changes and pipeline settlement can be realized. With the system of GPRS automatically data acquisition and wireless remote transmissions are achieved. Field test testify the effectiveness of the system, also shows that significant settlement and strain exist in the test pipe, and long-time monitoring and analysis is needed.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Settlement and Stress Monitoring System of Urban Buried Gas Pipeline


    Beteiligte:
    Chen, Zhi-Guang (Autor:in) / Qin, Chao-Kui (Autor:in) / Qiao, Ye-Teng (Autor:in) / Xia, Qin (Autor:in)


    Erscheinungsdatum :

    2012


    Format / Umfang :

    4 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch





    BURIED PIPELINE REPAIR SYSTEM

    PIRTLE JAMES | Europäisches Patentamt | 2016

    Freier Zugriff

    Buried pipeline repair system

    PIRTLE JAMES | Europäisches Patentamt | 2016

    Freier Zugriff

    Buried pipeline repair system

    PIRTLE JAMES | Europäisches Patentamt | 2017

    Freier Zugriff

    Study of Deflection of Buried HDPE Corrugated Pipeline under the Uneven Settlement of Soil

    Gu, Wenbo / Wu, Kai / Tong, Liyuan et al. | Springer Verlag | 2022