Karl Valley Quarry is the main quarry for the construction of the Pubugou Hydropower Project. With its developed faults, veins, dense joint-relief zones, deep pressure-relief zones and fissure, the slope has the possibility of integral and partial instability in the densely blasting and excavating process). Based on the rock elastic-plastic equivalent constitutive relations of joint-anchoring, by using the elastic-plastic element finite element method, the slope excavation and reinforcement as well as the stability is numerically simulated and analyzed. In addition, the reasonability of the initially drafted schemes for construction sequences and anchoring are evaluated and some valuable and instructive suggestions have been proposed to the engineering construction relevantly.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Finite Element Simulation of Excavation and Supporting of Karl Valley Quarry at Pubugou Hydropower Project


    Beteiligte:
    Xu, Guo-Zhang (Autor:in) / Zeng, Yi-Pei (Autor:in) / He, Meng-Zhu (Autor:in)


    Erscheinungsdatum :

    2012


    Format / Umfang :

    6 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Finite Element Simulation of Deep Excavation Failures

    Hung, Ching / Ling, Hoe I. / Kaliakin, Victor N. | Online Contents | 2014


    Hydropower supporting other renewables: Hydropower '10 Report

    Sullivan, Patrick | Online Contents | 2010




    Quarry section

    Engineering Index Backfile | 1929