Taking Motianling tunnel in Chongqing as an engineering background, the monitoring and measurement scheme is proposed for the extra-long tunnel under complex condition, and the field data and the numerical simulation results is analyzed. The results indicates that, the selected cross-section reflect overall state of the Motianling tunnel, and the structure safety monitoring during operation is considered; by tunnel internal and external observation, it is found that the tunnel face in F22 fault zone may not stay stability, because the monitoring information receive feedback timely, and the supporting measures is proper, the surrounding rock stay stability when excavating; for the typical section, the surrounding rock contact pressure is greater than interlayer pressure, primary lining sustains most of the load, and the secondary lining plays an assistant role as safety reservation; the maximum of anchor axial force and surrounding rock pressure occur at tunnel crown. By monitoring and numerical simulation, the dynamic excavation and design is realized, the Motianling tunnel is achieved safely and successfully at last.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Field Monitoring and Numerical Simulation Study on Mechanical Characteristics of Extra-Long Highway Tunnel


    Beteiligte:
    Li, Xun (Autor:in) / He, Chuan (Autor:in) / Xu, Guo-Wen (Autor:in)


    Erscheinungsdatum :

    2012


    Format / Umfang :

    5 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Numerical Simulation for Part Effect of Ventilation of Extra-Long Road Tunnel

    Liu, S. / Zhang, G.L. / Liu, X.W. | British Library Conference Proceedings | 2012


    Extra-long highway tunnel driving state evaluation method based on man-vehicle cooperation information

    ZHANG CONG / CHEN YADONG / ZHOU CHAO et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Highway tunnel vehicle passing monitoring device

    ZHAO XIAO / GU JIE / CHEN ZHUOWEI et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Method for disaster prevention and rescue of extra-long railway tunnel by adopting highway-railway dual-purpose vehicle

    LI XU / TAO WEIMING / WANG HUIWU et al. | Europäisches Patentamt | 2020

    Freier Zugriff