In order to ensure the highway design and construction turnkey project smooth implementation, it is necessary to proactively consider risks produced by highway design and construction turnkey model, and to input specific risk prevention and corresponding risk control measures. This paper firstly discusses risk control measures for highway design and construction turnkey model. Then, risk is reasonably contributed both the owners and general contractors. The risk range has also be defined between the owner and general contractor. In the ending of this article, there are some recommendations about risk prevention and control measures for highway design and construction turnkey project.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Risk Prevention and Control Measures in Highway Design and Construction Turnkey Project


    Beteiligte:
    Peng, Jun-Long (Autor:in)


    Erscheinungsdatum :

    2012


    Format / Umfang :

    6 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Athens Metro Heavy Rail Turnkey Project

    White, D. / American Public Transit Association | British Library Conference Proceedings | 1995


    Project Management and Operational Issues for Turnkey Procurements

    Stross, R. A. / Schneck, D. C. / American Public Transit Association | British Library Conference Proceedings | 1997


    Turnkey takes off

    Abbott, Jame | IuD Bahn | 2008


    Signature - Turnkey signing

    Clinquart, R. | Online Contents | 1998


    Implementing turnkey contracts

    East, R. / Institution of Mechanical Engineers / Institution of Civil Engineers | British Library Conference Proceedings | 2001