Travelling safely and comfortably on high speed railway lines requires excellent conditions of the whole railway infrastructure in general and of the railway track geometry in particular. The maintenance process required to achieve such excellent conditions is largely complex and expensive, demanding an increased amount of both human and technical resources. In this framework, an optimal scheduling of maintenance interventions is an issue of increased relevance. In this work a method for optimisation of the tamping scheduling is presented. It is based on a heuristic algorithm, which finds a very detailed tamping schedule where each planned intervention is fully specified. The algorithm tries to maximise an objective function, which is a quantitative expression of the maintenance process objectives defined by the railway company. It first finds an upper bound for the objective function value, and then returns the best feasible solution found. The method is validated by means of a case study based on real data of the 240 km track of a French high speed line. The results presented show that the value of the best solution found is very near to the upper bound with a difference smaller than 1 % and with a calculation time of under 1 second using a standard computer, so we think the heuristic has a great performance potential.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    A heuristic approach to railway track maintenance scheduling


    Beteiligte:
    Quiroga, L.M. (Autor:in) / Schnieder, E. (Autor:in)


    Erscheinungsdatum :

    2010


    Format / Umfang :

    13 Seiten, 4 Bilder, 1 Tabelle, 9 Quellen





    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    A heuristic approach to railway track maintenance scheduling

    Quiroga, L.M. / Schnieder, E. | British Library Conference Proceedings | 2010


    Heuristic Techniques for Scheduling Railway Track Maintenance

    Lake, M. / Ferreira, L. / Kozan, E. | Springer Verlag | 2002


    Minimising costs in scheduling railway track maintenance

    Lake, M. / Ferreira, L. / Murray, M. et al. | British Library Conference Proceedings | 2000


    Optimal Scheduling of Track Maintenance on a Railway Network

    Zhang, Tao / Andrews, John / Wang, Rui | Tema Archiv | 2013


    Optimizing Railway Track Maintenance Scheduling to Minimize Circulation Impacts

    Bueno, Paulo M. S. / Vilela, Plínio R. S. / Christofoletti, Luciano M. et al. | British Library Conference Proceedings | 2019