This paper deals with the possibility of installing a double-circuit gas insulated transmission line (GIL) in the pilot tunnel of the planned new railway galleries Bolzano (Italy)- Innsbruck (Austria). This EHV transmission line could represent a new fundamental step in reconstructing the transnational networks. The high GIL power ratings together with very low power losses would be a strong and highly efficient transmission tie between Italy and Austria particularly useful for the future European Market. The steady-state regime of the line and the electro-magnetic field impact are analyzed. Moreover, the paper discusses the necessary studies to be carried out and the problems that have to be faced.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Gas insulated transmission lines in railway galleries


    Beteiligte:
    Benato, R. (Autor:in) / Carlini, E.M. (Autor:in) / Di Mario, C. (Autor:in) / Fellin, L. (Autor:in) / Paolucci, A. (Autor:in) / Turri, R. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    2005


    Format / Umfang :

    6 Seiten, 10 Quellen




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Track galleries of the new main railway station at Stuttgart

    Schaechterle, M. | Engineering Index Backfile | 1924


    Italy-Austria GIL in the new planned railway galleries Fortezza-Innsbruck under Brenner pass

    Benato, R. / Brunello, P. / Carlini, E.M. et al. | Tema Archiv | 2006


    Italy - Austria GIL in the new planned railway galleries Fortezza - Innsbruck under Brenner Pass

    Benato, R. / Brunello, P. / Carlini, E.M. et al. | Tema Archiv | 2006


    Emission of Galleries, Trenches etc.

    Schulze, Christian / Kluth, Sebastian / Hübelt, Jörn | Tema Archiv | 2012