The first workover of a UK North Sea 'high pressure high temperature' (HPHT) production well was successfully completed in August 1999. The workover in Texaco's Erskine field resulted from failure of the duplex stainless steel production tubing in the through water zone. The workover benefited from detailed planning and peer reviews to identify necessary contingencies and technologies. The tubing failure was attributed to external chloride stress corrosion cracking in the annulus vapour space above a calcium chloride packer fluid. Although some details of the failure mechanism remain uncertain, the available information is presented to assist future HPHT well designers.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Erskine field HPHT workover and tubing corrosion failure investigation


    Beteiligte:
    Mowat, D.E. (Autor:in) / Edgerton, M.C. (Autor:in) / Wade, E.H.R. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    2001


    Format / Umfang :

    10 Seiten, 7 Quellen


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Titanium alloy tubing for HPHT applications

    Gonzalez, Manuel / Maskos, Krystian / Hargrave, Robert et al. | Tema Archiv | 2008


    Titanium alloy tubing for HPHT OCTG applications

    Hargrave, Bob / Gonzalez, Manuel / Maskos, Krystian et al. | Tema Archiv | 2010


    Hybrid coiled tubing system for offshore re-entry drilling and workover

    Selby, B. / Srinivasan, N. / Donnally, B. et al. | Tema Archiv | 1998


    Hydraulic rotary tubing tong suspension arm for ocean hydraulic workover rig

    ZENG QIAO / LI ZHONGHUA / LIU WENXIAO et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Development and application of a novel coiled tubing string for concentric workover services

    Quigley, P.A. / Nolet, S.C. / Williams, J.G. et al. | Tema Archiv | 1997