The maintenance engiheer should provide maximum operational readiness at lowest maintenance cost. the sum of correctiv e maintenance and of preventive maintenance gives a curve with a point of minimum cost.
Keeping aquipment operative
Engineering, London ; 212 , 4 ; 347-348
1972
2 Seiten, 2 Bilder, 5 Quellen
Aufsatz (Zeitschrift)
Deutsch
AWAKENING KEEPING DEVICE AND AWAKENING KEEPING METHOD
Europäisches Patentamt | 2017
|Online Contents | 2007
British Library Online Contents | 2012
|Tema Archiv | 1990
|