The first leg piles of the Heather Platform were instrumented using strain transducers and accelerometers that were attached to the pile just below its top. The signals were processed in real time providing for a hammer blow a printed output of hammer energy in the pile, maximum pile top force and other quantities. The signals were also recorded on analog magnetic tape. A detailed analysis was performed in the laboratory on a digital computer. Using wave equation type pile and soil models and both force distribution was determined. The Heather Platform piles were driven through two followers connected by gravity. Stress wave effects from the connectors were studied and losses to the impact wave were determined. (Kursetz)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Pile driving measurements on the heather platform installation


    Weitere Titelangaben:

    Die Messungen beim Treiben von Pfeilern fuer eine Bohrplattform im Heather-Bohrsektor


    Beteiligte:
    Rausche, F. (Autor:in)


    Erscheinungsdatum :

    1978


    Format / Umfang :

    8 Seiten, 5 Bilder, 3 Tabellen, 4 Quellen


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    A study pile capacity for the heather platform

    Parry, R.H.G. | Tema Archiv | 1978


    Sliding pile driving platform for pile driving barge

    LI ZEWEI / LI HUI / FAN XIANCAI et al. | Europäisches Patentamt | 2015

    Freier Zugriff


    Deepwater ocean platform pile foundation installation method

    HUANG SHANTIAN / WEI JIAGUANG / LI HUAILIANG et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    Pile fixing system for wind power installation platform

    ZHANG LEI / WANG YAO / CHEN MINYANGYI | Europäisches Patentamt | 2020

    Freier Zugriff