Design studies plus a three-year, large-scale, offshore model test have demonstrated the applicability of a guyed tower as a deepwater drilling and production platform. This paper describes the basic guyed tower concept and presents key results obtained from the field test. The main features about the design, fabrication, and installation of a fullscale guyed tower drilling and producing platform in 350 meters of water are discussed. (Jensen)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    The guyed tower as a platform for integrated drilling and producing operations


    Weitere Titelangaben:

    Eine seilverspannte Plattform zum kombinierten Bohren und Produktion


    Beteiligte:
    Finn, L.D. (Autor:in) / Wardell, J.B. (Autor:in) / Loftin, T.D. (Autor:in)


    Erscheinungsdatum :

    1978


    Format / Umfang :

    6 Seiten, 10 Bilder, 4 Quellen


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Guyed robot

    YUAN JUN / JIAO HAIKUN / PEI XUELIANG et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Wind and wave induced behaviour of offshore guyed tower platforms

    Bisht, R.S. / Jain, A.K. | Tema Archiv | 1998


    Investigation of In-Service Failure of Guyed Tower Anchor Rod

    Van Dyke, P. / Blanchette, Y. / Paquette, R. et al. | British Library Conference Proceedings | 1998


    Cathodic protection of a guyed tower in 1000 feet of water

    Rau, J.F. / Michie, T.W. / Smith, S.N. | Tema Archiv | 1986


    Modeling and Feedback Control for a Guyed, Flexible, Tubular Lunar Tower

    Portmann, Victor P. / Miller, Alex S. / Zhang, John Z. et al. | IEEE | 2024