Design studies plus a three-year, large-scale, offshore model test have demonstrated the applicability of a guyed tower as a deepwater drilling and production platform. This paper describes the basic guyed tower concept and presents key results obtained from the field test. The main features about the design, fabrication, and installation of a fullscale guyed tower drilling and producing platform in 350 meters of water are discussed. (Jensen)
The guyed tower as a platform for integrated drilling and producing operations
Eine seilverspannte Plattform zum kombinierten Bohren und Produktion
European offshore petroleum conf. and exhibition, Earls Court ; 1 , Oct ; 193-198
1978
6 Seiten, 10 Bilder, 4 Quellen
Aufsatz (Konferenz)
Englisch
Wind and wave induced behaviour of offshore guyed tower platforms
Tema Archiv | 1998
|Investigation of In-Service Failure of Guyed Tower Anchor Rod
British Library Conference Proceedings | 1998
|Cathodic protection of a guyed tower in 1000 feet of water
Tema Archiv | 1986
|British Library Conference Proceedings | 1998
|