Since 1968, when the Deep Sea Drilling Project (DSDP) began its world-wide scientific drilling and coring operations aboard the D/V GLOMAR CHALLENGER, the project has been at the forefront of deep ocean technology exploring the geologic history of the earth. In August 1975, DSDP accepted a new challenge, the International Phase of Ocean Drilling (IPOD). Crucial to this new deep ocean challenge was the refinement of the project's deep water reentry hardware to permit penetration of the volcanic basement underlying the ocean floor. This paper covers the analysis, design and operation of DSDP's deep water reentry cone/dual casing hanger system developed in 1975.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Glomar challenger's deep water reentry cone/dual casing hanger system


    Weitere Titelangaben:

    Tiefseebohrungen mit Konusbohrmeissel und Dualfutterrohren vom Glomar Challenger


    Beteiligte:
    Storms, M. (Autor:in) / Gerken, J. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1977


    Format / Umfang :

    9 Seiten, 14 Bilder


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch







    Drawer type road cone hanger rack

    HU XILING / WU ZHIQIANG / XIE YI et al. | Europäisches Patentamt | 2015

    Freier Zugriff

    Aerodynamic heating on a blunt-cone reentry vehicle

    Gonzales, Steven C. | TIBKAT | 1981