The VAL System is designed to operate in a fully automatic mode. The primary objectives of this design were: - safety: the fail-safe concept is one of the major VAL principles; - dependability: an effective combination of redundancies and alternative operating modes is used to achieve a high system dependability; - high level of performance: the headway can be as low as 60 seconds including a 30-second dwell time; - a low cost of operation: minimum operating and maintenance personnel is required for service and trains are unmanned. The VAL control system design provides all automatic functions necessary to perform safe and reliable transportation of people over a wide range of operating conditions.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Lille Metro: description of the VAL control system


    Weitere Titelangaben:

    Die Untergrundbahn von Lille: Beschreibung des VAL-Systems fuer Sicherheitsueberwachung und automatische Zugsteuerung


    Beteiligte:
    Nakache, F. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1984


    Format / Umfang :

    6 Seiten, 2 Bilder


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Lille Metro

    Smith, M. | Tema Archiv | 1993


    Leicht-Metro System VAL fuer Lille

    Frenz | Kraftfahrwesen | 1983


    Die Tunnelbauten der Metro Lille

    Neusy, D. | Tema Archiv | 1995