The main cause of cost escalation was identified to be in the application, interpretation, demonstration of compliance, and enforcement of specifications and standards in RFPs and contracts. The study identified seven areas in which 111 potential cost driver military specifications and standards were associated. The study message: contractor and government seem equally at fault.
Can tailoring deflate mil-spec document balloon? EIA workshop study says yes
Kann ein Zurechtschneidern die aufgeblaehten militaerischen Spezifikationen abspecken? Die Studie des EIA sagt ja
Microwaves ; 17 , 4 ; 9-10
1978
2 Seiten, 1 Tabelle
Aufsatz (Zeitschrift)
Englisch
Actuated umbrella valves to deflate bladder in balloon envelope
Europäisches Patentamt | 2015
|Rapid-deflate valve stem and associated systems and methods
Europäisches Patentamt | 2025
|