Scheduling the night-shift and morning-shift duties pairing plan (NMDPP) is a common process in Chinese metro crew management. Since metro crews work in a special working environment, sufficient rest is essential for them. NMDPP will affect the rest time of crews on metro lines with multiple depots and handover points. To improve the rest time of crews, this paper proposes a binary programming model to optimise the NMDPP. Moreover, a hybrid algorithm combining General Variable Neighbourhood Search (GVNS) with an Assignment Algorithm is designed to find high-quality solutions for this problem. Finally, computational experiments with both artificial data and real-life data are conducted. The results indicate that the GVNS can obtain high-quality solutions efficiently for various NMDPPs. Besides, the proposed method can effectively increase the rest time of crews compared to the practical method used in metro companies.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Scheduling method for pairing night-shift and morning-shift duties on metro lines with complex structure


    Beteiligte:
    Zhu, Zixuan (Autor:in) / Xu, Ruihua (Autor:in) / Wang, Fangsheng (Autor:in) / Vansteenwegen, Pieter (Autor:in)


    Erscheinungsdatum :

    2024-05-03




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Night Shift

    Heaton, John | IuD Bahn | 1996


    Hospital goes wireless to improve night shift care

    British Library Online Contents | 2007


    Working the Martian night shift - the MER surface operations process

    Mishkin, A.H. / Limonadi, D. / Laubach, S.L. et al. | Tema Archiv | 2006


    Approaches to objective shift scheduling analysis

    Pflueger,F. / AVL List,Graz,AT | Kraftfahrwesen | 2014