In automated container terminals, effectively scheduling quay cranes (QCs), automated guided vehicles (AGVs), automated stacking cranes (ASCs) and AGV routing are two important problems. This paper studies the combinatorial optimization of two problems in the synchronous loading and unloading operation mode of the automated container terminal. First, a bi-level programming model for integrated scheduling problems is established with the goal of minimizing the completion time of all containers. Secondly, in order to solve the model, we design two bi-level optimization algorithms based on conflict resolution strategy: bi-level adaptive genetic algorithm based on conflict resolution strategy (CRS-BAGA) and bi-level genetic algorithm based on conflict resolution strategy (CRS-BGA). Finally, the effectiveness of the two optimization algorithms is verified by numerical experiments. Experimental results show that the proposed optimization algorithms are effective. They can coordinate the scheduling of three equipments and solve the conflict congestion problem of AGV.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Integrated scheduling in automated container terminals considering AGV conflict-free routing


    Beteiligte:
    Shouwen, Ji (Autor:in) / Di, Luan (Autor:in) / Zhengrong, Chen (Autor:in) / Dong, Guo (Autor:in)

    Erschienen in:

    Transportation Letters ; 13 , 7 ; 501-513


    Erscheinungsdatum :

    09.08.2021


    Format / Umfang :

    13 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt