This paper investigates the possible problems of laying submarine power cables (SPC). It provides information about the power cables themselves, the laying procedure, and the respective fleet. It also describes the medium voltage (MV) transmission grid in Greece and determines the correlation of different parameters that affect the operation of the network. Furthermore, a reliability analysis, based on a statistical model, is conducted; the model is used to evaluate the operational characteristics of cables, such as the rate of failures from natural or human causes, and is also used to choose between different candidate cable routes in order to determine the one with the maximum reliability.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Submarine power cables: laying procedure, the fleet and reliability analysis


    Beteiligte:
    Ventikos, Np (Autor:in) / Stavrou, Di (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    01.01.2013


    Format / Umfang :

    14 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    The laying and maintenance of submarine cables

    Kunert, H. | Engineering Index Backfile | 1920



    Simultaneous laying and burying machine for three submarine cables

    Kojima, K. / Eguchi, K. / Takemoto, Y. | Tema Archiv | 1985


    Laying submarine cables: Alcatel cable ships new generation and logistics

    Lapierre, H. / Barret, A. | British Library Online Contents | 2005


    Submarine cables

    Prentice, T. M. / Allied Forces, Combined Intelligence Objectives Sub-Committee | TIBKAT | 1945