The importance of the method to determine the performance of the schedule duration during the project is in planning because it can determine the success or failure of the project because the duration often does not match the predictions due to project uncertainty so that there is no loss. This paper will discuss the accuracy of the schedule performance method between the earned value (EV) method and earned schedule (ES) method. Specifically, this paper aims to determine which schedule performance index (SPI) accuracy is better than the two methods. This paper discusses SPI against time and progress with the aim of knowing the performance of the project schedule over time and the progress of work between the earned value and earned schedule methods based on the average SPI value of the ongoing project and the results of R square ES greater than EV which is close to 1 and the SPI graph The time and work progress shows that the ES method is closer to 1 or closer to the plan than the EV method, so this paper shows that the ES performance estimate is better in assessing schedule performance compared to the EV method.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Accuracy of Schedule Performance Calculation with ES Method and EV Method


    Weitere Titelangaben:

    Lecture Notes in Civil Engineering


    Beteiligte:
    Lie, Han Ay (Herausgeber:in) / Sutrisna, Monty (Herausgeber:in) / Prasetijo, Joewono (Herausgeber:in) / Hadikusumo, Bonaventura H.W. (Herausgeber:in) / Putranto, Leksmono Suryo (Herausgeber:in) / Kristiandi, Cangga (Autor:in) / Anondho, Basuki (Autor:in)


    Erscheinungsdatum :

    2022-02-01


    Format / Umfang :

    12 pages





    Medientyp :

    Aufsatz/Kapitel (Buch)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Accuracy of Schedule Performance Calculation with ES Method and EV Method

    Kristiandi, Cangga / Anondho, Basuki | TIBKAT | 2022


    CONSTRUCTION ACCURACY CALCULATION SYSTEM AND CONSTRUCTION ACCURACY CALCULATION METHOD

    IWATA KENGO | Europäisches Patentamt | 2018

    Freier Zugriff

    OPTIMIZED MAINTENANCE SCHEDULE CALCULATION METHOD AND APPARATUS FOR RAILWAY SYSTEM

    KIM JONGWOON / ENDHARTA ALFONSUS JULANTO / JEONG DOSIK et al. | Europäisches Patentamt | 2022

    Freier Zugriff

    SCHEDULE GUIDE DEVICE, SCHEDULE GUIDE METHOD AND SCHEDULE GUIDE PROGRAM

    JO MANAMI / ISHIBASHI KENTARO / YOSHIDA ATSUSHI et al. | Europäisches Patentamt | 2017

    Freier Zugriff

    SCHEDULE PLANNING SYSTEM AND SCHEDULE PLANNING METHOD

    YANO HIROHITO | Europäisches Patentamt | 2015

    Freier Zugriff