In order to solve serious traffic congestion in Belgrade, a number of studies regarding the Belgrade Metro construction have been carried out since 1973. However, only in 2019, the routes of the future metro lines 1 and 2 were defined as a part of the General Metro Construction Project. The lines are designed to intersect at the location of Sava Square, where an interchange metro station will be built. It represents a complex geotechnical structure consisting of three different parts: a part of the metro station for line 1, a part of the metro station for line 2, and a common part for both metro lines. Due to the complexity of construction and different depths of the diaphragm walls, deeper than 40 m on the part of metro line 2, phased construction is planned. In this regard, determination of geotechnical modeling for each part separately as well as geotechnical design are presented including the analysis of phased methods of excavation, influence of pore and effective stresses on the stability of the diaphragm wall, lateral and vertical displacements as well as the interaction between diaphragm walls and reinforced concrete slabs.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One


    Weitere Titelangaben:

    Lecture Notes in Civil Engineering


    Beteiligte:
    Rujikiatkamjorn, Cholachat (Herausgeber:in) / Xue, Jianfeng (Herausgeber:in) / Indraratna, Buddhima (Herausgeber:in) / Stanic, Nemanja (Autor:in) / Rakic, Dragoslav (Autor:in) / Isek, Josip (Autor:in) / Simic, Slavoljub (Autor:in)

    Kongress:

    International Conference on Transportation Geotechnics ; 2024 ; Sydney, NSW, Australia November 20, 2024 - November 22, 2024



    Erscheinungsdatum :

    23.10.2024


    Format / Umfang :

    7 pages





    Medientyp :

    Aufsatz/Kapitel (Buch)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Metro Line U5 in Berlin - design challenges due to complex geotechnical conditions

    Seegers, Jörg / Erdmann, Paul / Schmeiser, Josef | Tema Archiv | 2013


    Carrying equipment facilitating metro station decoration construction

    ZHANG JIAO / CUI XIAOYAN / CUI XIAORI | Europäisches Patentamt | 2022

    Freier Zugriff


    Connectivity of metro station location with urban space – a study of Hanoi metro line N°2.3

    Giang Vu Thi Thuy / Van Che Le / Vinh Than Dinh et al. | DOAJ | 2023

    Freier Zugriff